The restoration Project "NEW HOME 2017"
We planned the renovation as a live-able environment. Considering my age, the place must be barrier free and with clever house technic incorporated. The facility must be self-sustaining (Electricity), Water Distribution
Water treatment, water tank, pumps...Sewerage Disposal-> Soak Away, All 3 bedrooms need a WC / Shower facility. All rooms need Air Conditioned. All windows are fix (5mm glass), iron security doors are a must. Most installation material,
was over time, sourced over the internet (
amzon and others). Furniture, Laminates, Household Machines, ... where also bought over the internet, mainly from Germany. The material was sent to
Wegmüller AG, Attikon and
finally packed into a bought 20' container and shipped in
2015 to Tema / Accra.
The empty container was furnished to serve as quarter for a household help. We installed an uninterruptible power supply: from the Grid, the Solar Installation or the 25Kw Diesel Generator, all controlled by a Hybrid Inverter.
There is no sewage water system so all has to be done with a Soak-Away (drainage well). Water is coming from the Water Work into a 75'000l tank and is than,
after filtering, distributed by 2 pumps.